Property Overview
Gaia De Eleonor I is an economic housing subdivision located in Cambanac, Baclayon, Bohol. The project offers 51 residential lots with modern amenities and accessible pricing. The subdivision features concrete roads, drainage systems, and complete utility infrastructure. Each lot is 100 sqm with flexible financing options available through a 72-month payment plan.
Units
Available units in Gaia De Eleonor I
Location & Neighbourhood
- Full AddressBarangay Cambanac, Baclayon, Bohol, Philippines
- SubdivisionGaia De Eleonor
- City / MunicipalityBaclayon
- ProvinceBohol
- Zip Code6307
- Walkability Score45
Nearby Places
- Baclayon Town Center5 km5 minutes drive
- Ace Medical Hospital10 km10 minutes drive
- Island City Mall (Tagbilaran)15 km15 minutes drive
- Beaches5 km5 minutes drive
- Genaro Grill5 km5 minutes drive
About the Neighbourhood
Cambanac, Baclayon is a quiet residential area in Bohol with access to essential services. The area is characterized by suburban development with proximity to beaches and tourist destinations. The neighborhood offers a mix of residential and commercial activities with developing infrastructure.
Flood Risk Information
Baclayon is located in a low-risk flood zone with modern drainage systems implemented in the subdivision to manage water runoff effectively.
Legal Documentation
Zoning Information
Residential - Economic Housing (EH) Subdivision - BP 220
Available Documents
All documents are subject to verification. Please consult with your legal advisor before making any decisions.
Additional Information
- Reason for SellingDeveloper launching new residential subdivision in Baclayon
- Accessibility NotesLocated in accessible area with proximity to main roads and public services
Market Insights
Comparative Listings
Historical Price Trends
Baclayon residential lot prices range from PHP 200,000 to PHP 550,000 for 100 sqm lots depending on location and amenities. Gaia De Eleonor I offers mid-range pricing with structured amenities.
Future Development Plans
The project is expected to complete by June 1, 2026, with ongoing development of residential infrastructure and community amenities.