Property Overview
Paz Catalina Columbarium Metro Central is a world-class, modern 14-level iconic building featuring 13 floors above ground, built on a 2,840 sqm property at the corner of C.M. Recto Avenue and Tomas Mapua Street in Manila. The project is 100% owned and managed by Paz Life Plans Holdings, Inc. (PLPHI) with development partners from Taiwan and Singapore. The columbarium features approximately 120,000 vaults with themed designs from renowned Taiwanese artist Lu Tung-Hsing. Hotel-like amenities include an elegant incense hall, ecumenical chapel, meditation garden, celestial staircase, ceremonial halls, memorial plaque hall, tea house, and a rooftop meditation area. The structure incorporates 10 floors dedicated to columbarium vaults, 3 parking levels (2 above ground), and an entrance foyer with vaulted ceiling reception lobby.
Location & Neighbourhood
- Full Address1501 C.M. Recto Avenue Corner Tomas Mapua Street, Barangay 313, Santa Cruz, Manila
- SubdivisionSanta Cruz
- City / MunicipalityCity of Manila
- ProvinceMetro Manila
- Zip Code1014
- Walkability Score85
Nearby Places
- Recto Station (LRT)1 km5-10 minutes on foot
- FEATI University0.5 km10 minutes walk
- PCC Central (Perpetual Help College)0.8 km10-15 minutes walk
- Quiapo Church1.2 km15-20 minutes on foot
- UST (University of Santo Tomas)1 km15 minutes
About the Neighbourhood
Located in the heart of Manila's historic Sta. Cruz district on CM Recto Avenue, the area is highly accessible via LRT Recto Station and surrounded by educational institutions. The location provides easy access to major commercial and educational hubs while maintaining the tranquility needed for a contemplative memorial space.
Flood Risk Information
Sta. Cruz, Manila is in a flood-prone area. The columbarium structure is designed with earthquake and fire-rated materials for safety.
Legal Documentation
Zoning Information
Non-Residential (NR) - Commercial/Memorial Use
Additional Information
- Reason for SellingMemorial and columbarium services offering
- Cultural HeritageDesigned to honor Filipino-Chinese traditions and practices including burning of paper offerings. Incorporates design elements from Taiwanese and Singaporean development partners.
- Accessibility NotesGround level entrance foyer for easy accessibility. Elevator access to all floors.
Market Insights
Future Development Plans
Expected completion date: March 31, 2025. Project will house approximately 120,000 vaults when fully completed. Additional vault offerings including Quad (4-urn) vaults being finalized.